Infinity Pulse
Loading...
Infinity Pulse
App failed to load
We couldn't start the application. This might be a temporary issue. Please try a hard refresh (Ctrl/Cmd + Shift + R) or clear your browser cache.

    Next intake review: Friday 19 June

    Apply

    Health & Safety

    How To Write A RAMS (Risk Assessment & Method Statement)

    A RAMS is the document main contractors and auditors look for first. It combines a Risk Assessment (what could go wrong) with a Method Statement (how the work will be done safely). Done well it wins tenders. Done poorly it stops work on site.

    The Steps

    1. 1

      Define the activity and scope

      State the exact task, location, dates and personnel involved. Vague RAMS get rejected. List every distinct activity separately rather than lumping them together.

    2. 2

      Identify the hazards

      Walk the activity step by step and list every hazard: falls, manual handling, electricity, noise, dust, machinery, lone working, working at height, COSHH substances. Reference HSE guidance where applicable.

    3. 3

      Identify who could be harmed

      List employees, subcontractors, members of the public, vulnerable persons (young workers, pregnant workers, neurodiverse staff). Be specific.

    4. 4

      Score the risk

      Use a 5x5 matrix: Likelihood (1 to 5) x Severity (1 to 5). Anything 15 or above must have additional controls before work starts.

    5. 5

      List the control measures

      Hierarchy of control: Eliminate, Substitute, Engineering controls, Administrative controls, PPE. Always work top down. PPE is the last resort, never the first answer.

    6. 6

      Re-score the residual risk

      After controls, re-score. The residual risk should be 8 or below. If not, add more controls or stop the activity.

    7. 7

      Write the method statement

      Sequential, numbered steps explaining exactly how the work will be done safely. Include emergency procedures, first aid arrangements, and who is the appointed person.

    8. 8

      Sign off and brief the team

      Author, reviewer and approver must all sign. Every operative must read and sign that they understand it before starting work. Keep records for at least 3 years.

    Free Resource

    Get the templates that go with this guide

    Download the 2026 UK SME Compliance Pack, every template referenced above, plus rate cards and checklists. Emailed instantly.

    No spam, unsubscribe one click.

    Want This Done For You?

    Infinity Connect members get every template, every workflow and a UK-accredited practitioner on speed dial. Included.

    Start My Application

    We use cookies

    We use cookies to ensure you get the best experience on our website and to manage your login session.